Industrial project

Translating Technical Documentation for Construction of the Kazakhstan Aluminium Smelter

Translation of the complete package of design and cost-estimate documents, drawings, and technical instructions for construction of the Kazakhstan Aluminium Smelter (KAS), Kazakhstan’s largest industrial project, valued at $850 million.

Industrial project
Conceptual illustration

About the Client

NFC Kazakhstan LLP is a subsidiary of China Nonferrous Metal Industry’s Foreign Engineering and Construction Co., Ltd. (NFC), one of China’s largest state-owned nonferrous metals companies, listed on the Shenzhen Stock Exchange (code: 000758).

NFC’s Scale of Operations:

  • Active in 50+ countries
  • Ranked among the Top 250 international contractors by Engineering News-Record (ENR)
  • Specializes in EPC contracts (engineering, procurement, construction) in mining and metallurgy
  • A major contractor on Belt and Road Initiative projects

The KAS Project:

  • Client: Kazakhstan Aluminium Smelter JSC (part of ERG — Eurasian Resources Group)
  • General contractor: NFC Kazakhstan
  • Location: Pavlodar, Kazakhstan
  • Cost: $850 million
  • Capacity: 250,000 metric tons of primary aluminum per year
  • Significance: Kazakhstan’s first and only aluminum producer

The Challenge

Scale and Complexity

Construction of the largest aluminum plant in Kazakhstan’s history required a vast volume of critical technical documentation to be translated on tight deadlines. The project was delivered under an EPC contract (engineering, procurement, construction), requiring translation of:

  • Design and cost-estimate documentation — the complete set of design solutions
  • Engineering drawings — construction and process diagrams
  • Technical instructions — for equipment, installation, and operation
  • Equipment specifications — from Chinese and international suppliers
  • HSE documentation — occupational health and safety requirements

Specific Requirements

  1. Multiple source languages: Documentation arrived in two languages — English (from international equipment suppliers) and Chinese (from NFC and Chinese contractors). Both streams had to be translated into Russian.

  2. Technical specificity: The project used advanced Chinese aluminum smelting technology with GAMI and NEUI electrolytic cells rated at 320–330 kA, previously unused in Kazakhstan.

  3. Tight deadlines: The first phase was built in a record 27 months (2005–2007). Documentation was needed immediately to keep construction moving.

  4. Critical accuracy: Errors in technical documentation for an $850 million facility could have caused:

    • Construction delays
    • Incorrect installation of equipment worth hundreds of millions of dollars
    • Industrial accidents
    • Multimillion-dollar losses
  5. Regulatory requirements: Documentation had to comply with Kazakhstani construction codes and international safety standards.


The Solution

Our Approach

iText organized a comprehensive translation process to meet the required quality and deadlines:

1. Building a Specialized Team

  • Technical translators specializing in metallurgy and industrial construction
  • Chinese translators — an essential skill that was rare in Kazakhstan’s market
  • Engineer-editors for technical review and terminology control
  • A project manager to coordinate with NFC Kazakhstan

2. Technology Infrastructure

  • CAT tools (Smartcat) used to:

    • Build a unified project terminology database
    • Keep translations consistent across documents
    • Speed up work on recurring passages
    • Check quality at every stage
  • File format management:

    • Work with CAD drawings while preserving the original formatting
    • Process technical specifications in Excel
    • Translate project documents in Word/PDF
    • Adapt Chinese designation standards for Kazakhstani practice

3. Quality Control

Three-stage QA process:

  1. Translation — by a specialized translator
  2. Technical editing — review by a metallurgical engineer
  3. Final proofreading — checks of formatting and consistency

Specialized glossaries:

  • Aluminum smelting terminology (Russian–English–Chinese)
  • Construction terminology
  • Equipment and component designations
  • HSE terminology

4. Work Organization

  • Prioritization: Documents essential to starting construction were translated first
  • Parallel processing: English and Chinese documents were handled simultaneously
  • Direct communication: Engineers at NFC Kazakhstan were consulted promptly on terminology questions
  • Flexibility: The team was ready for urgent requests and changing priorities

Results

Quantitative Results

  • Translation volume: Full package of technical documentation for an $850 million plant
  • Language pairs: English→Russian + Chinese→Russian
  • Collaboration period: 2006–2010 (all construction phases)
  • Document types: Design and cost-estimate documentation, drawings, instructions, specifications, HSE documents

Qualitative Results

1. Successful Project Completion

The Kazakhstan Aluminium Smelter was built and commissioned in record time:

  • September 2007 — first phase commissioned (125,000 metric tons/year)
  • June 2010 — second phase commissioned (full capacity of 250,000 metric tons/year)
  • The second-phase opening ceremony was personally led by President of the Republic of Kazakhstan Nursultan Nazarbayev

2. Recognition of Project Quality

The KAS received numerous national and international awards:

  • Silver medal for excellence in engineering construction (Kazakhstan)
  • President of Kazakhstan’s Altyn Sapa Award — “Quality Leader” (2016)
  • Product registration on the London Metal Exchange (LME, 2009)
  • EBA European Quality Award
  • Ranked among the top ten aluminum plants worldwide out of 200 plants

3. Formal Recognition from the Client

NFC Kazakhstan LLP formally thanked iText translation agency:

“NFC Kazakhstan LLP thanks iText translation agency for the fast, high-quality translation of a large volume of technical documentation from English into Russian and recommends iText translation agency as a responsible and professional partner.”

— N. Jinjun, Deputy General Manager for Finance, NFC Kazakhstan LLP

4. Long-Term Collaboration

Successful delivery of the KAS project led to:

  • Continued collaboration with NFC Kazakhstan on its other projects in Kazakhstan
  • A reputation as a reliable partner for major EPC contractors
  • Greater expertise in translation for Belt and Road Initiative projects

iText Expertise Applied to the Project

Technical Capabilities

✓ Metallurgy: Aluminum smelting, production technology, prebaked anodes
✓ Industrial construction: Design and cost-estimate documentation, drawings, installation diagrams
✓ Equipment: Electrolytic cell specifications, process equipment
✓ HSE: Occupational safety, industrial safety, environmental requirements

Language Capabilities

✓ Chinese→Russian: A rare specialization in Kazakhstan’s market
✓ English→Russian: Technical English for industry
✓ Standards adaptation: Chinese standards → Kazakhstani requirements

Project Management

✓ Working with major international contractors
✓ Managing multilingual projects
✓ Meeting tight deadlines
✓ Quality control to international standards


Project Significance

For Kazakhstan

  • The first aluminum production facility in independent Kazakhstan’s history
  • The largest private investment in metallurgy ($850–900 million)
  • A key element of the aluminum cluster in Pavlodar Region
  • Creation of high-tech jobs (1,500 people)

For iText

  • Proof of its ability to work on megaprojects (>$500 million)
  • Distinctive expertise in translation for Chinese EPC contractors
  • A reference project for Belt and Road Initiative work
  • Demonstrated capability in metallurgy and industrial construction

Applying This Experience

Experience gained on the KAS project applies directly to current and future industrial projects in Kazakhstan:

Chinese Investment Projects

China invested $23 billion under the Belt and Road Initiative in 2025. Current projects include:

  • Mining complexes (Bozshakol, Aktogay)
  • Metallurgical plants
  • Petrochemical facilities
  • Infrastructure projects

All require technical documentation translated from Chinese and English.

ERG and Other Industrial Giants

ERG continues to carry out major projects:

  • Modernization of existing facilities
  • New mining projects (Bolashak deposit — $2 billion)
  • Environmental projects

Growing Demand for Technical Translation

  • The B2B industrial translation market in Kazakhstan is estimated at hundreds of millions of tenge annually
  • Shortage of translators specializing in technical Chinese
  • No specialized agencies positioning themselves as experts in industrial translation

Why This Case Study Matters

  1. Scale: $850 million demonstrates capacity to work on the largest projects
  2. Complexity: An EPC contract, two language pairs, and critical accuracy requirements
  3. Reference: Work with a Chinese state-owned company ranked among the world’s Top 250 contractors
  4. Result: A formal client recommendation
  5. Relevance: Direct application to the current surge of Chinese investment in Kazakhstan

Conclusion

The Kazakhstan Aluminium Smelter project demonstrates iText’s ability to translate technical documentation for industrial megaprojects to international quality standards.

Our Chinese and English translation expertise, deep understanding of metallurgical processes, and experience with major EPC contractors make iText a reliable partner for industrial companies pursuing Belt and Road Initiative projects and other major industrial investments in Kazakhstan.

Contact

A complex task? Let’s talk.

Send us your documents and we will estimate the cost and timeline for your project.

Get a Quote
itext@itext.kz+7 771 267 21 55Message us on WhatsApp

Pavlodar, 25 Victory Square, Office 106
Monday–Friday, 9:00 a.m.–6:00 p.m. (Astana time)